Growth Tracking

V3 Electric Progress Report

Tracking the performance delta from March 25, 2026 to March 25, 2026.

Baseline Performance

2.8 / 10

Recorded: March 25, 2026

Current Visibility

2.8 / 10
Maintained Level

Last Audit: March 25, 2026

Visibility Delta Breakdown

Comparative Analysis across core pillars
Pillar Baseline Current Delta
Technical SEO 3.5 3.5 0.0
AI Visibility 2.5 2.5 0.0
Local / GBP 4 4 0.0
Content Quality 3 3 0.0
Trust Node Coverage 4 4 0.0

Implementation Accomplishments

Authority Anchor

Integrated professional leadership bios and verified credentials to establish the E-E-A-T signals required by LLMs for citation.

Structured Mapping

Deployed massive JSON-LD FAQ and Service schema across the portal to ensure search models can ingest site data as fact-nodes.

Infra Optimization

Resolved indexing bottlenecks, verified sitemap health, and optimized mobile render paths to maximize AI-crawler efficiency.